Monte Carlo planner beats baselines in simulated robot tasks

Researchers combined sequential Monte Carlo sampling with gradient-based updates to plan robot actions using learned world models. Their preprint reports higher average success than several baselines in simulation, though results varied by task and horizon.

Monte Carlo planner beats baselines in simulated robot tasks

A robot-planning method combining sequential Monte Carlo sampling with gradient-based optimization achieved a 79.8% average success rate across simulated task settings, outperforming several comparison methods in the researchers’ tests. In a preprint submitted on November 19, the authors report that the planner searches for action sequences using learned world models and a cost function informed by previous state transitions.

Source arxiv.org

The team reported an average success rate 7.4 percentage points higher than model predictive path integral control, or MPPI, across 12 task-and-horizon settings. The authors are Hrishikesh Viswanath, Anindita Ghosh, Uttaran Bhattacharya and Aniket Bera, with affiliations at Purdue University, Saarland University and Adobe Systems.

Sampling plans and updating them

The method treats each candidate particle as a complete sequence of actions. It moves and reweights a population of these sequences, resampling when their weights become sufficiently concentrated, while an optimizer updates the nominal plan from the weighted population.

The planner works in the latent space of a pretrained world model: a compact representation used to predict how observations change under actions. The authors also introduce a cost-to-go based on a partial differential equation, using a roadmap built from transitions in an offline dataset.

That cost is an alternative to judging a predicted final state only by its distance from the goal representation. The roadmap uses observed transitions to approximate connections between states, while the full planning cost also includes the final-state distance and a penalty on actions.

How the simulations were run

The researchers evaluated Reacher, Point maze, Wall, Push-T and Cube using the LeWM and DINO-WM world models. Their main comparison gave each planner 12 candidate action trajectories and a limit of 150 iterations, using the same pretrained world model and the same starting and goal pairs for each comparison.

For each environment except Cube, the team used 100 trials with distinct starts and goals; Cube used 50. The tests considered planning horizons of 5, 10 and 15 world-model steps, except for Cube, which used a horizon of 5.

After each iteration, the current plan was executed in the simulator from the starting state. A trial succeeded when the state reached at the end of the plan met the environment’s success criterion; trials stopped at their first success.

Results varied by task

The proposed planner had the highest success rate in eight of the 12 main task-and-horizon settings, according to the preprint. It significantly exceeded the strongest baseline in four settings after the researchers’ correction for multiple comparisons: all three Reacher horizons and Wall at a horizon of 5.

At the longest Push-T horizon, gradient descent performed best, with a 5% success rate compared with 4% for the proposed planner. MPPI led in the other three settings where a baseline finished ahead: Point maze at a horizon of 15 and Wall at horizons of 10 and 15.

In Cube, 21 of the 50 starting positions already had the block within 0.04 m of its target, and every planner solved those trials. The proposed method succeeded on 88% of all Cube seeds and 79% of the remaining 29, compared with MPPI’s 86% and 76%, respectively, the researchers reported.

Cost and computation limits

The authors found that the PDE-based cost improved the proposed planner’s Reacher success rates by 22 and 62 percentage points at horizons of 10 and 15, respectively, compared with its distance-based cost. On Wall at those same horizons, the distance-based cost led by 8 and 7 percentage points, although neither difference was statistically significant.

The researchers did not compare wall-clock time or memory, noting that both depend on implementation choices. The paper also leaves convergence guarantees for the coupled sampling and optimization updates as an open problem.